Plan The Schedule

Posted in Concept, and Lean Six Sigma

Schedule of improvement Project

Preparation of planning for improvement such as Six Sigma projects must be done carefully. An urgent project should be promptly dealt with a systematic and scheduled according to need. However, otherwise it will not abandon the rules of research and improvement has been learned, which must still treat the improvement project with a systematic and proper procedures.

The test product should be fixed step by step in accordance with standard operating system.
Schedule to be prepared for example, determining the theme, identifying problems, setting goals, designing the project, meetings are conducted regularly and intensively, the test method in the field, determination of results and presentation of results and standardization.

Plan-Do-Check-Action | PDCA Concept

Posted in Concept

The concept applied in the improvement cycle such as Shewhart; s cycles (PDCA Concept) is a simple step, but if carried out in accordance with existing procedures will have a huge effect on improvement. Plan-Do-Check-Action returned to the Plan-Do-Check-Action and so on.

Stages PDCA Concept if would like further elaborated the following explanation:
PLAN: Planning an improvement project which will be composed of the following activities: