Pull System for JIT Production

Posted in Toyota Production System

Toyota’s JIT production is a method to adapt to changes due to disturbances and changes in demand by making all the necessary processes to produce goods at the time it takes the required amount. The first requirement for JIT production is to make all the process of knowing the exact timing and amount needed.

In the usual system of production control, the above requirements be met by issuing a variety of production schedules on all the process: The process of manufacturing spare parts and also on the line of rafts. This process produces spare parts spare parts in accordance with the schedule, using a push system, meaning the former to supply spare parts to the next process. However, this method will make it difficult adjustment quickly to changes caused by disturbances arising in some process or due to fluctuations in demand. With ordinary systems, to adapt to various changes during the month, the company must modify the production schedules for each process simultaneously; the approaches makes it difficult schedule changes many times. As a result, companies need to hoard stocks among all the processes to solve problems and change requests. Thus, such systems often creates an imbalance of dosage between processes, which often results in dead stock, surplus equipment and surplus workers when the model changes occur.

Remove All Stocking wastage

Posted in Management, and Manufacturing Waste


Stocking wastage in question is a stock that exceeds the capacity or an abnormal condition that is produced. Of course, not only the existing stock in the warehouse. But also all the stock which is still in process. All stock must strive to normal because if these conditions persist will lead to stability disrupted production.

Stocking wastage is not only material or product ready for sale but could be spare parts, tools and others. As described earlier in the warehouse stock issues should refer to the management fully based on the concept of 5S. And all the wastage that has to do with the stock must remove.