Skip to content

Tag: Machining and treating waste

Inadequacy in Consideration of Work Contents

Posted in Manufacturing Waste

Inadequacy in addition to consideration of process sequences there are things that sometimes often do not seem that it is a waste of Inadequacy in consideration of work contents. The definition of work content is part of a job or process that is done by machine or human. Or in a smaller scope again is part of the activities of workers in working on a product. They sometimes do not realize that the work they do is work in vain, in the sense that if eliminated would not be a problem.

For example in the manufacture of factory bolts, one bolt-making process that there is no use of the jig process aims to measure the length of the bolt. Several times the workers are wiping jig used to measure these bolts. This jig cleaning activity when accumulated can seize a long time, whereas the quality is not so meaningful in the sense that if he did not commit any no effect

Inadequacy in Consideration of Process Sequence

Posted in Manufacturing Waste


The design process in a factory system will not end. The reforms would have to remain to be done to obtain an optimal system. Optimal in terms of productivity, quality and avoid waste in the area of process. Inadequacy in consideration of the process sequence is that many cases occur during the process towards improvement in the factory. Most important is the ability of engineers to be able to identify and analysis capabilities can reduce waste in production.

The order process is systematic and easy in manufacturing will help workers get the job done well. But sometimes with considerations of quality and perfect product. But all the components to be achieved must be packaged in a simple system and neatly arranged.