Pull System for JIT Production

Posted in Toyota Production System

Toyota’s JIT production is a method to adapt to changes due to disturbances and changes in demand by making all the necessary processes to produce goods at the time it takes the required amount. The first requirement for JIT production is to make all the process of knowing the exact timing and amount needed.

In the usual system of production control, the above requirements be met by issuing a variety of production schedules on all the process: The process of manufacturing spare parts and also on the line of rafts. This process produces spare parts spare parts in accordance with the schedule, using a push system, meaning the former to supply spare parts to the next process. However, this method will make it difficult adjustment quickly to changes caused by disturbances arising in some process or due to fluctuations in demand. With ordinary systems, to adapt to various changes during the month, the company must modify the production schedules for each process simultaneously; the approaches makes it difficult schedule changes many times. As a result, companies need to hoard stocks among all the processes to solve problems and change requests. Thus, such systems often creates an imbalance of dosage between processes, which often results in dead stock, surplus equipment and surplus workers when the model changes occur.

Information via the Kanban : Toyota Production System

Posted in Toyota Production System

These cards are in circulation in Toyota factories, between Toyota and other companies that work with him. And in the factories of companies that work together is. In this way, Kanban can convey information about the number of shots and the amount of production to achieve JIT production.

Flow of 2 Kanban

For example we make the products A, B and C in a raft line. Spare parts needed to manufacture these products are a and b are produced by the previous engine line. Spare parts a and b are stored behind this line and Kanban production orders from this line attached to him.