Skip to content

Tag: Carrying Waste

Additional Installation of Carrying Facilities

Posted in Manufacturing Waste

One way to reduce waste is by additional installation of carrying facilities. Carrying waste is a complex problem because the waste could be due to the planning of factory layouts that do not refer to the concept of lean manufacturing.

Adding installations for the transport facilities are also not a simple problem, because the addition of new facilities mean changing the existing layout. With the elements of manufacturing that is a waste should be avoided. The addition of this facility not only increase the speed and transmission capacity, but must consider other factors. Does the addition of this facility does not interfere with views of the factory, whether the addition of this facility in accordance with a layout that refers to the concept of 5S, and whether the addition of this facility does not affect the performance of another section. Everything must be planned carefully and thoroughly.

Increase of Man-hour Incurred by Wasteful Carrying

Posted in Manufacturing Waste

Increased working hours of workers in lean manufacturing concepts should be avoided as much as possible because it costs to workers will be even greater. Similarly, with Increase of man-hours incurred by wasteful carrying. Carrying activities should be set only 5% of overall production activity, but because too much waste then what happens is time-consuming activity of carrying up to 30%.

A company that let the state of waste take place, the land will gradually undermine the financial company. The biggest expenditure that can be felt are paying more salary workers because of the overtime hours that should not be necessary.