Skip to content

5SManagement.com Posts

Stock Control

Posted in Management


Stock control in the production must be observed by all parties. Because if any one of the blank material, the production will not work. If production can not run the time wastage will occur. Lean manufacturing certainly will not be achieved. Therefore, various ways have done to keep the remains there is no excess stock or less.

5S management role here is emphasized to ensure adequate supply to remain available. Effectiveness of stock is very helpful to reduce waste time and waste WIP is the basic component for building a lean manufacturing are well preserved

Briefing Every Morning Before Work

Posted in Campaign, and Management

Training and training, briefing and briefing. Achieving lean manufacturing through the 5S management will be accomplished if reminded of every time. To remind the concept, management and implementation of 5S done with training. Training is not only meeting in the classroom, but every time there is a job that requires training is always inserted 5s management and implementation.

In addition, each morning meeting, each group containing the job briefing must start with the implementation of 5S. Do they fulfill the conditions of the workplace 5S standards that exist or not. Are all the members already understand the procedures of implementing the 5S workplace respectively. Everything should be responsible for maintaining controlled conditions.