Skip to content

Category: Case Study

Can Equipment be Replaced by Hand?

Posted in Case Study, and Seiri


Seiri, Get rid of as much as possible tools that can be replaced by hand. That is what must be considered in lean manufacturing. Getting rid of the equipment here does not mean eliminating a tool that should reduce the burden on humans in performing their duties, but if the equipment can be replaced with empty hands,then transmission jack is one of the equipment.To buy the jack checkout this transmission jack review from autonews.center. Conversely, exclusion of this tool should help workers complete the task quickly.

WIP STOCK Problems

Posted in Case Study, Management, and Seiton


Work-In-Process (WIP) on the production process must be managed as efficiently as possible. Emphasized the importance of lean manufacturing systems reduce material stock / WIP on the existing production.